Boeing to start 737 Max production on new assembly line July 6, CEO says
The new 737 Max final assembly line in Everett, Washington, will serve as a catalyst for increasing Max production to 52 jets per month.
لماذا يهم هذا الخبر؟
سيظهر الملخص التحليلي هنا بعد اكتمال معالجة الذكاء الاصطناعي.
سياق الخبر
The new 737 Max final assembly line in Everett, Washington, will serve as a catalyst for increasing Max production to 52 jets per month.
فتح الخبر الأصلي